1.2 million tons/year gold project in the Middle East by China National Geological & Mining Corp.

China National Geological & Mining Corp(CGM) is the wholly state-owned enterprises directly under the previous Ministry of Geology and Mineral Resources, Ministry of Land and Resources. Its business coverage is wide. The project was located in Saudi Arabia. The local climate is hot and rainless so the working conditions were poor. The gold production line crushing equipment from our company included jaw crusher PE900 * 1200 (1 unit), multi cylinder hydraulic cone crusher HPT500 (1 unit), multi cylinder hydraulic cone crusher HPT300 (3 units). The maximum capacity reached 360 t/h, and final product particle size reached 12mm, and the production line worked steadily.
Daily operation: 16 hours; Material: Gold Mine; Final product size: 0-12mm.

On-site Photo

 

Customer Feedback

 

 

Because of poor local conditions, the stability of the equipment is required highly. We have visited many domestic equipment manufacturers, and ultimately chose the SBM industry. The equipment is very reliable in practical production, besides,the production condition is very stable.Manager Li, Head of Project Department

 

Production Process

 
Back
Top
Close