Products
Mobile Crusher
Crushing Equipment
Grinding Mills
Complete Crushing Plant
Sand Making Plant
Grinding Mill Plant
MTW Continental Trapezoid Mill:

MTW series mill system adopts vertical structure; occupies only a small area and main unit owns sealed gear box as well as transmits evenly.
The important parts adopt high quality steel.
The electric system adopts centralization of control. Feed size is small and light that save the energy.

MTW Trapezium Mill
Structure:
The standard configuration of MTW series Mill consists of main unit, powder classifier, blower, elevator, feeder, hopper, cyclone collector, dust catcher, blower, motor, pipe, electric control box and so on.
Brochure Download (28 April 2008)
MTW Trapezoid Mill Specifications:
Item MTW110 MTW138 MTW175
Roller number(pcs) 4 4 5
Inner diameter of roller (mm) Ф1100 Ф1380 Ф1750
Speed(r/min) 120 96 75
Max. feed size(mm) < 30 < 35 < 40
Final size(mm) 1.6~0.045
Fineness can reach to 0.038
1.6~0.045
Fineness can reach to 0.038
1.6~0.045
Fineness can reach to 0.038
capacity
(t/h)
3.5~10 6.5~15 11~25
Overall dimension(mm) 8910×6950×9010 9860×8340×10227 13500×11500×9500
Weight
(t)
18 28.5 46
Name Item Unit Sepcification
MTW110 MTW138 MTW175
Main unit motor Model   Y280M-6 Y315M1-6 Y355M1-6
Power Kw 55 90 160
Speed Rpm 980 990 990
Motor of classifier Model   YCT200-4A
(YCT200-4B)
YCT200-4B
(YCT225-4A)
YCT225-4A
(YCT225-4B)
Power Kw 5.5(7.5) 7.5(11) 11(15)
Speed Rpm 125~1250 125~1250 125~1250
Motor of blower Model   Y250M-4 Y280M-4 Y315L1-4
Power Kw 55 90 160
Speed Rpm 1480 1480 1490
Elevator Model   TH250 TH250 TH315
Motor   Y100L2-4 Y100L2-4 Y112M-4
Power Kw 3 3 4
Speed Rpm 1420 1420 1420
Jaw crusher Model   PE250×400 PE250×400 PE250×750
Motor   Y180L-6 Y180L-6 Y200L2-6
Power kw 15 15 22
Speed Rpm 970 970 970
feeder Model   GZ2F GZ3F GZ4F
Power w 150 200 450

Note: This specification is just reference, any changes are subject to the products.

  • CQC: ISO9001:2000
  • Certificate: CE
  • Brand Name: SBM
  • Model Number: MTW Series
  • Port: Shanghai
  • Delivery Time: 30 days
  • Place of Origin: Shanghai China
  • Rating:
Page Tools Print Email